Optional Nutrient System (for cottages)
In houses where there is no continued use of the Wastewater treatment unit, WehoPuts
has developed a nutrient solution system in order to maintain the treatment plant
operation even during the breaks. The nutrient solution enables up to three months
downtime in a WP5 treatment plants. The feeding of the nutrient solution is completely
automatically and works with a dosing pump which is specially developed for this
purpose.
The nutrient System of WehoPuts includes the container, the dosing pump and the
necessary operating components, which can optionally be offered when ordering the
unit WP5 & WP10.
The unit is easy to install even in a treatment plant, already in operation.
Watch installation Video